On-site tests

The purpose of the on-site tests is to validate the treatment solutions envisaged, according to the needs of water treatment expressed by the clients.

Prise tétraA Linaë mobile unit of 1 m3/hour capacity is carried and installed in the treatment area. This unit is integred in a shelter  with transport rollers and has a flexible piping. These equipments allow quick implementation, without particular means. The electric connection is made with a tetra plug (Tri + neutral + earth).

Water withdrawals are done before and after the Linaë Unit, after a few minutes of setting time and are analysed. These analysis allow to validate the test and to determine exactly the Linaë solution to implement.